Subfloor Leveling & Preparation
We level and prepare subfloors so your new hardwood or LVP installs flat and lasts for decades.
Subfloor Leveling & Preparation for Your Home
Subfloor leveling, moisture testing, and prep before hardwood or LVP installation.

- Subfloor moisture testing
- Leveling of high and low spots
- Plywood and sleeper installation
- Flat-rate pricing with no hidden prep fees
- In-house crew, no subcontractors
Our Subfloor Leveling & Preparation Process
A structured approach so your floor is measured, prepped, and installed with precision from start to finish.
Step 1
Moisture Test
We test the subfloor for moisture and will not proceed if readings are outside the safe range.
Step 2
Leveling
We grind down high spots and fill low spots to create a flat surface.
Step 3
Subfloor Install
We install plywood or sleepers as needed for a stable base.
Step 4
Final Check
We re-measure for flatness and confirm the subfloor is ready for flooring.
Frequently Asked Questions
Ready to Start Your Subfloor Leveling & Preparation Project?
Tell us about your floor. We will measure, check your subfloor, and deliver a written line-item estimate within 24 hours with no hidden prep or disposal fees.